Walter Reed Medical Center
ARCHITECTURAL EXCELLENCE
Well publicized concerns over the deteriorating hospital conditions provided for injured war veterans and their families at both the Army’s Walter Reed Medical Center in Washington, DC and the Naval Hospital in Bethesda, MD resulted in the appropriation of $640,000,000 to construct a new Walter Reed facility in Bethesda and to do substantial renovation of the Naval Hospital. During this massive construction effort, Mobilease teamed with the world class construction team of Clark Construction and Balfour Beatty Construction to provide a temporary pediatric clinic. The 7,020 SF, non-combustible structure includes (32) exam rooms. It was installed directly adjoining the existing hospital and a portion of the modular structure roof is only inches below an existing pedestrian bridge. This full turnkey project includes Hardipanel® “stucco” exterior painted to match the stucco finish on the existing, site built structure. All interior finishes are architectural spec quality and conform to UFC 4-510-01.